light brown building surrounded by bright green grass, with a pathway leading to the buildings entrance
Contact
Rodrigo Martini, Senior Project Manager, standing outside in front of an outdoor urban setting, featuring modern architectural elements with clean lines. There are hints of greenery, suggesting some trees or plants.
Rodrigo Martini
Director
Share

Project overview

Growth in South and Central America

The parts distribution centre brings in 15,000sqm area, a mezzanine with 1,500sqm, 800sqm office area and the Paccar Experience Centre, that highlights for visitors the company’s global vision, technology, dealership network and the facility’s amenities. The Brazilian operation is a milestone of Paccar’s expansion outside of Europe, boosting strong growth for South and Central American dealers. 

The new structure allows:

  • Sales growth, along with an increased product offering and dealer development

  • Storage capacity and picking efficiency improvement

  • Increase of 600 percent in logistic capability

  • Capacity to handle 800 local and global suppliers

  • Capable of handling over a million order lines per year

Project story

Project and cost management

We provided project management and cost management services from start-up to completion, including a procurement strategy of basic design and build contractor, design management, site supervision, handover and close-out. Key highlights of our work included:

  • Development of a procurement strategy to meet the client’s tight operational requirements, resulting in the development and approval of a basic design and associated specifications, before launching a request for proposal for a design and build contractor
  • This procurement strategy contemplated key dates to mitigate construction during the notorious rainy season of the region. The Design and Build contractors were instructed to develop a construction sequence to facilitate ‘topping out’ of the building as early as possible to mitigate exposure to the elements
  • Modification of the contract type from guaranteed maximum price to partial lump sum to accommodate the volume of direct invoices needing to be processed by the client
  • Cost management team was able to finish and deliver project under the expected budget (around seven percent on the overall project)
  • Our cost control avoided an extra BRL 5.6MM due to commercial negotiation and scope validation
  • All necessary licences were granted ensuring the client was able to start operation right after substantial completion.

Environmentally and socially sustainable

Paccar’s project is an important milestone for the Brazilian market, as local logistics are based on transportation by trucks. A wide and continuous availability of parts locally facilitates its strength in the market by providing high quality supplies.

One of Paccar’s goals is to be environmentally and socially sustainable and this was reflected in their requirements for the new building. For example, the parts distribution centre was designed to include circa 300 LED lamps and 80 skylights to decrease energy consumption by 40 percent and ergonomic crafting tables were installed for their employees.

The project required maintenance of work productivity at a good level while respecting COVID-19 protocols and ensuring a safe environment for all workers. The parts distribution centre was safely and successfully completed on schedule and budget.

The company has 18 distribution centres globally and Ponta Grossa’s facility is the second in South America.

related

You might also be interested in these projects

Shot of the IPA Project Routemap in the UK.
United Kingdom

Shaping best practice with the Infrastructure and Projects Authority

3 min read

Aerial view of a large industrial facility in Balvanera, Mexico, showing multiple warehouse buildings, parking areas and nearby roads
Mexico

Modernising the Balvanera manufacturing site with Siemens

2 min read

Factory worker in white lab coat bottling water
United Arab Emirates

Eliminating single-use plastic water bottles at Atlantis, The Palm 

2 min read

Sunny exterior shot of the AESC Douai battery gigafactory in France.
France

Driving the shift to clean mobility with AESC

3 min read

Aerial shot of ALP West Logistics Park exterior, Kenya
Kenya

Building sustainable warehousing in Kenya with Africa Logistics Properties

2 min read

Panasonic Project in Kansas, USA.
United States

Building a world-class battery manufacturing hub with Panasonic

2 min read

Aerial shot of Faurecia’s sustainable automotive plant in France.
France

Building a low-carbon automotive plant with Faurecia

3 min read

Nairobi Gate Industrial Park, Kenya
Kenya

Bringing Nairobi Gate Industrial Park to life with Impact North 

2 min read

EXPLORE MORE
A group of employees having a casual chat in the break room with a table with apples.
Services
Battersea Power Station lit up at night, view from the Thames with buildings in the backgroundImage courtesy: Placeholder
Sectors
Male and female colleagues having a casual chat in the break room.
Join us