Project overview

Reducing flood risk

We have supported the Environment Agency (EA) since 2011, providing full commercial, project management and advisory services in the successful delivery of their flood and coastal erosion risk management programme, alongside habitat enhancement and wider business improvement initiatives.

In 2007 the areas of Perry Barr and Witton in Birmingham were devastated when the River Tame burst its banks and caused flood damage to over 400 properties. This EA scheme will reduce future flood risk along the river by constructing a 1.7 million cubic metre flood storage reservoir in the Sandwell Valley and flood defence walls through Witton. The project reduces flood risk for 1,379 properties with estimated financial benefits exceeding £440m.

As well as the benefits to properties and businesses, approximately 20,000 trees will be planted in the Sandwell Valley, creating a large wet woodland habitat and circular walking path. This will help naturalise the river, improving the area’s ecological biodiversity.

project story

Implementing systems

Our project team led the implementation of efficient and productive project management systems on the Perry Barr project, particularly from pre-contract negotiations, including cost management services to agree and evaluate the target cost at contract appointment.

Our team implemented change control procedures alongside business case updates to EA’s large projects board. These updates involved extensive workshops and communication with key stakeholders, bringing them together to share a collaborative approach to development in the local community. Our project management oversight retained close control over the project, which was expected to complete in 2021.

Involving the community

This project was complex; unlike most standard infrastructure schemes it involved multiple landowners and the temporary flooding of an area over four square kilometres. Our involvement was to lead the scheme as client project manager up to completion. Significant stakeholder engagement dominated this role, including nature conservation charity the RSPB, local golf club and school and Birmingham and Sandwell councils.

The project held environmental days on site, bringing together the project team(s) and volunteers (including some from our organisation).

related

You might also be interested in these projects

Uisce Éireann employee in high-vis jacket observes factory operations from raised platfrom, Ireland
Ireland

Transforming water services across Ireland with Uisce Éireann

2 min read

Riverside infrastructure along the River Yare, Great Yarmouth, UK
United Kingdom

Strengthening Great Yarmouth’s flood resilience with the Environment Agency  

4 min read

Aerial of Ladybower Reservoir, Derbyshire, England, UK
United Kingdom

Managing AMP8 capital investment with Northumbrian Water Group

2 min read

Bridgewater Tidal Barrier Scheme on the River Parret, Somerset, UKImage courtesy: © SiteEye
United Kingdom

Strengthening Bridgwater's flood resilience with the Environment Agency

3 min read

Aerial of small-scale solar panel set up used to power water systems, Uganda
Uganda

Supporting sustainable water supply in Uganda with Nexus Green

2 min read

Aerial view of Millport harbour and flood protection scheme, Scotland, UK
United Kingdom

Protecting Millport from coastal flooding with North Ayrshire Council

3 min read

Multi-tiered weir of running water, Australia
Australia

Managing a major water infrastructure programme for Queensland with Seqwater

4 min read

Two employees standing on the catwalk of a large water basin installation at a Sydney Water facility, Sydney, Australia
Australia

Strengthening water infrastructure planning and investment with Sydney Water

2 min read

Fire fighters in yellow suits operating water hoses in rural area
United States

Supporting wildfire recovery with Oregon Department of Transportation

2 min read

Reservoir facility with intake tower and footbridge against hilly backdrop.
United Kingdom

Future-proofing essential water services with Dŵr Cymru Welsh Water

2 min read

EXPLORE MORE
A group of employees having a casual chat in the break room with a table with apples.
Services
Battersea Power Station lit up at night, view from the Thames with buildings in the backgroundImage courtesy: Placeholder
Sectors
Male and female colleagues having a casual chat in the break room.
Join us