Project overview

Reducing flood risk

We have supported the Environment Agency (EA) since 2011, providing full commercial, project management and advisory services in the successful delivery of their flood and coastal erosion risk management programme, alongside habitat enhancement and wider business improvement initiatives.

In 2007 the areas of Perry Barr and Witton in Birmingham were devastated when the River Tame burst its banks and caused flood damage to over 400 properties. This EA scheme will reduce future flood risk along the river by constructing a 1.7 million cubic metre flood storage reservoir in the Sandwell Valley and flood defence walls through Witton. The project reduces flood risk for 1,379 properties with estimated financial benefits exceeding £440m.

As well as the benefits to properties and businesses, approximately 20,000 trees will be planted in the Sandwell Valley, creating a large wet woodland habitat and circular walking path. This will help naturalise the river, improving the area’s ecological biodiversity.

project story

Implementing systems

Our project team led the implementation of efficient and productive project management systems on the Perry Barr project, particularly from pre-contract negotiations, including cost management services to agree and evaluate the target cost at contract appointment.

Our team implemented change control procedures alongside business case updates to EA’s large projects board. These updates involved extensive workshops and communication with key stakeholders, bringing them together to share a collaborative approach to development in the local community. Our project management oversight retained close control over the project, which was expected to complete in 2021.

Involving the community

This project was complex; unlike most standard infrastructure schemes it involved multiple landowners and the temporary flooding of an area over four square kilometres. Our involvement was to lead the scheme as client project manager up to completion. Significant stakeholder engagement dominated this role, including nature conservation charity the RSPB, local golf club and school and Birmingham and Sandwell councils.

The project held environmental days on site, bringing together the project team(s) and volunteers (including some from our organisation).

related

You might also be interested in these projects

Man in high vis inside a project site
Ireland

Transforming water services across Ireland with Uisce Éireann

2 min read

Fire fighters in yellow suits using a water hose
United States

Supporting wildfire recovery with Oregon Department of Transportation

2 min read

Three solar panels next to a few small houses with blue roofs, with a background of jungle foliage.
Uganda

Supporting sustainable water supply in Uganda with Nexus Green

2 min read

Water infrastructure and two men wearing high vis
Australia

Strengthening water infrastructure planning and investment with Sydney Water

2 min read

Barge with cranes working on a river flood barrier construction site in the UKImage courtesy: © SiteEye
United Kingdom

Strengthening Bridgwater's flood resilience with the Environment Agency

3 min read

Areal view of harbor with green grass and blue sea
United Kingdom

Protecting Millport from coastal flooding with North Ayrshire Council

3 min read

Aerial view of Ladybower Reservoir, a large artificial reservoir, the lowest of three in the Upper Derwent Valley in Derbyshire, England, UK  Thank you This photo has been successfully downloaded. (Look for it in your Downloads folder or the last place you saved a file.) Having issues? Download again We do not accept AI-generated content into our visual library Credit:Alexey_Fedoren  Stock photo ID:2154208389 Upload date:May 23, 2024 Location:United Kingdom
United Kingdom

Managing AMP8 capital investment with Northumbrian Water Group

2 min read

Weir of running water in Australia
Australia

Managing a major water infrastructure programme for Queensland with Seqwater

4 min read

Dŵr Cymru Welsh Water, UK.
United Kingdom

Future-proofing essential water services with Dŵr Cymru Welsh Water

2 min read

EXPLORE MORE
A group of employees having a casual chat in the break room with a table with apples.
Services
Battersea Power Station lit up at night, view from the Thames with buildings in the backgroundImage courtesy: Placeholder
Sectors
Male and female colleagues having a casual chat in the break room.
Join us